Home  Product and Services Guide  Stories, articles, and how-to's  Old-House-Friends Forums
"Controlling Unwanted Moisture" an Historic Preservation Brief October 11, 2008


How to clean rain lamp...
Member Sign In|Company Sign In





Controlling Unwanted Moisture
in Historic Buildings

Sharon C. Park, AIA
Controlling Unwanted Moisture

What's in this article



more detail


Introduction

Remedial Actions within an Historic Preservation Context

How and Where to Look for Damaging Moisture

Looking for Signs

Uncovering and Analyzing Moisture Problems

Transport or Movement of Moisture

Surveying and Diagnosing Moisture Damage: Key Questions to Ask

Selecting an Appropriate Level of Treatment

Ongoing Care

Conclusion

Selected Reading

Glossary

Acknowledgments


Return to the Knowledge Base

 << Previous Page 
Viewing Page 12 of 19
Next Page >> 

Selecting an Appropriate Level of Treatment

The treatments that follow this section in chart format are divided into levels based on the degree of moisture problems. Level I covers preservation maintenance; Level II focuses on repair using historically compatible materials and essentially mitigating damaging moisture conditions; and Level III discusses replacement and alteration of materials that permit continued use in a chronically moist environment. It is important to begin with Level I and work through to a manageable treatment as part of the control of moisture problems. Buildings in serious decay will require treatments in Level II, and difficult or unusual site conditions may require more aggressive treatments in Level III. Caution should always be exercised when selecting a treatment. The treatments listed are a guide and not intended to be recommendations for specific projects as the key is always proper diagnosis.

Start with the repair of any obvious deficiencies using sound preservation maintenance. If moisture cannot be managed by maintenance alone, it is important to reduce it by mitigating problems before deteriorated historic materials are replaced. Treatments should not remove materials that can be preserved; should not involve extensive excavation unless there is a documented need; and should not include coating buildings with waterproof sealers that can exacerbate an existing problem. Some alteration to historic materials, structural systems, mechanical systems, windows, or finishes may be needed when excessive site moisture cannot be controlled by drainage systems, or in areas prone to floods. These changes, however, should, be sensitive to preserving those materials, features, and finishes that convey the historic character of the building and site.

Level I Preservation Maintenance

Exterior: Apply cyclical maintenance procedures to eliminate rain and moisture infiltration.


Installing ventilating fans can improve damp conditions or reduce cooling loads. Photo: NPS files.

Roofing/guttering: Make weather-tight and operational; inspect and clean gutters as necessary depending on number of nearby trees, but at least twice a year; inspect roofing at least once a year, preferably spring; replace missing or damaged roofing shingles, slates, or tiles; repair flashing; repair or replace cracked downspouts.

Walls: Repair damaged surface materials; repoint masonry with appropriately formulated mortar; prime and repaint wooden, metal, or masonry elements or surfaces; remove efflorescence from masonry with non-metallic bristle brushes.

Window and door openings: Eliminate cracks or open joints; caulk or repoint around openings or steps; repair or reset weatherstripping; check flashing; repaint, as necessary.

Ground: Apply regular maintenance procedures to eliminate standing water and vegetative threats to building/site.

Grade: Eliminate low spots around building foundations; clean out existing downspout boots twice a year or add extension to leaders to carry moisture away from foundation; do a hose test to verify that surface drains are functioning; reduce moisture used to clean steps and walks; eliminate the use of chlorides to melt ice which can increase freeze/thaw spalling of masonry; check operation of irrigation systems, hose bib leaks, and clearance of air conditioning condensate drain outlets.


 << Previous Page 
Viewing Page 12 of 19
Next Page >> 



  Ads by Google

  Members:  Sign In  |  Register  |  Benefits  |  Feedback  |  Tell-a-Friend  |  Help
  Companies:  Sign In  |  Account Manager  |  Promote Your Company  |  Register  |  Help Advertise

Copyright ©2008 by Renovators, a TB Systems company. All rights reserved. Privacy policy.